warehouse-0

Precise Requirements, Smart Planning

Logistics / E-commerce Warehousing Logistics / E-commerce Warehousing

Warehouse Adaptation Scenarios

Logistics / E-commerce Warehousing

Manufacturing Supporting Warehousing

Chemical & Hazardous Materials Warehousing

3 Major Pain Points

01

Excessive internal columns restrict automation systems and high-rack layout efficiency.

02

Tight construction schedules delay operational launch.

03

Rapid business growth requires flexible and scalable warehouse expansion.

01

Large-span, column-free design improves the efficiency of automated logistics systems.

02

Factory-prefabricated steel components combined with on-site assembly significantly shorten the construction timeline.

03

Expandable steel structure warehouse systems that reserve capacity for future e-commerce growth.

3 Major Responses

Excessive internal columns restrict automation systems and high-rack layout efficiency.

01
01

Large-span, column-free design improves the efficiency of automated logistics systems.

Tight construction schedules delay operational launch.

02
02

Factory-prefabricated steel components combined with on-site assembly significantly shorten the construction timeline.

Rapid business growth requires flexible and scalable warehouse expansion.

03
03

Expandable steel structure warehouse systems that reserve capacity for future e-commerce growth.

Heavy raw materials and semi-finished products require high load-bearing capacity.

01
01

High load-bearing steel structure systems designed to safely support heavy industrial storage demands.

Poor coordination between warehouse and workshop affects production efficiency.

02
02

Integrated warehouse and workshop design to streamline internal production logistics.

Different materials require specific storage conditions, such as moisture-proofing and corrosion resistance.

03
03

Utilize hot-dip galvanized or anti-corrosion coated steel structures, combined with insulation and ventilation systems.

Flammable and explosive materials present high fire and safety risks.

01
01

Equip the steel structure with fireproof coatings, fire compartmentation systems, and explosion relief roofing systems.

Chemical corrosion can significantly reduce the service life of steel structures.

02
02

Apply heavy-duty anti-corrosion steel structure systems to extend the service life of chemical warehouses.

Strict international regulations lead to high compliance and certification costs.

03
03

Provide full compliance design and documentation in accordance with target country standards (such as EN and NFPA).

WeiLan Solutions

Precision design and material optimization for cost reduction
Precision design and material optimization for cost reduction
Rapid construction with delivery within 1-3 months
Rapid construction with delivery within 1-3 months
High-durability steel for easy maintenance and 30-year lifespan
High-durability steel for easy maintenance and 30-year lifespan
Customized to the dimensions of the owner's equipment to ensure production efficiency.
Customized to the dimensions of the owner's equipment to ensure production efficiency.
Modular design for future rapid expansion
Modular design for future rapid expansion
WeiLan Solutions

Workshop Reference Configuration

Floor Plan

Column spacing 6-7.5 meters, span 15-36 meters, eave height: 9-12 meters

Main Steel

Q355 / Q235 (Optional ASTM A572 Gr.50 / S355)

Columns and Beams

Precast Welded H-Section Steel / Hot-Rolled H-Section Steel Components

Steel Structure Connection Methods

High-strength bolt connection (10.9-grade large hex head high-strength bolt sets), ordinary galvanized bolt connection

Wall

PU-Edged Rock Wool Sandwich Panels / Pure PU Sandwich Panels / Standard Rock Wool Sandwich Panels

Roof

PU-Edged Rock Wool Sandwich Panels / Pure PU Sandwich Panels / Single-Layer Colored Profiled Steel Sheets + Glass Wool Insulation Layer (Cold Bridge Prevention) + Galvanized Steel Wire Mesh

Doors

Industrial Electric Roll-Up Doors / Heavy-Duty Sliding Doors / Lift-Up Doors

Windows

Aluminum alloy windows / High-level skylights / Ventilation louvers

Surface Corrosion Protection for Steel Components

Hot-dip galvanizing / Epoxy zinc-rich primer + micaceous iron oxide intermediate coat + epoxy topcoat (or fluorocarbon topcoat) / Red lead anti-rust primer + alkyd topcoat

Cranes

3-5 tons / 5-10 tons / 10-16 tons (configured according to Warehouse requirements)

Roof Drainage Systems

Free-flow drainage / Siphonic drainage system / Gravity drainage system

Frame Configuration

Multiple Options Available

Ventilation Methods

Roof FRP skylight strips / Roof motorized smoke exhaust windows
What is Weilan responsible for in your project?

What is Weilan responsible for in your project?

We are committed to delivering high-quality buildings to our clients by providing complete and mature prefabricated steel structure building solutions and comprehensive services throughout the entire process. We support the construction and development of various industries and help your business thrive.

01

Structural Design Responsibility

Design and calculation based on building function, load conditions, and local standards

02

Manufacturing Responsibility

All steel components are fabricated, pre-assembled, and inspected in our factory

03

Delivery & Installation Support

Complete erection drawings and technical guidance,with remote or on-site support when required

04

Post-Delivery Engineering Support

Continuous support for future expansion, modification, or technical issues

Warehouse Project Case Studies

Based on delivered warehouse project cases, summarizing the application characteristics of steel structures under different storage requirements.

Puxiang E-commerce Warehouse

Puxiang E-commerce Warehouse

Area: 4,719 m²
Span: 23 m single span
Features: Medium-span steel structure warehouse with high space utilization, supporting fast turnover and efficient e-commerce operations.
View More
Shimeike Supporting Warehouse

Shimeike Supporting Warehouse

Area: 12,000 m²
Span: 30 m single span
Features: Large single-span steel structure design with no internal columns, ideal for large equipment storage and centralized logistics operations.
View More
Fude Chemical Zoned Warehousing Project

Fude Chemical Zoned Warehousing Project

Area: 10,059.87 m²
Configuration: 5 buildings – spare parts warehouse, finished goods area, loading bay, product warehouse, and residue storage facility
Features: Multi-functional zoned steel structure warehouse complex with clearly defined production and storage areas, meeting the safety and management requirements of chemical warehousing.
View More
warehouse-2

Get in Touch

Planning a Steel Structure Warehouse? Let Us Provide an Efficient, Scalable Custom Solution with Fast Delivery!

Get in Touch

Planning a steel structure workshop?Let us provide you with a professional customized solution for rapid production!
Project Location
Building Use
Building Dimensions
High Racking Required
Number of Floors
Roof Type
Are Internal Columns Permitted
Floor Load Requirement
Loading or Unloading Method
Loading Dock Requirement
Wall or Roof Material
Wind Load
Snow Load
Fire Protection Rating
Email
WhatsApp
Contact Person
Other Requirements