delong technology steel structure workshop phase ii-0

Precise Requirements, Smart Planning

bg

Delong Technology: Steel Structure Workshop Phase II

Share: youtube

Key Information Display

  • Area: 2680 ㎡
  • Roofing panels: The roof panels are made of 0.6mm thick 760mm angle-seam 3 color steel plates, with a reinforced glass wool mesh and ventilation louvers. The roof is load-bearing and can accommodate photovoltaic systems. The wall panels are made of 0.5mm thick 750mm color steel plates on the outside and 0.4mm thick 880mm perforated sound-insulating color steel plates on the inside. The walls are filled with 100kg/m³ rock wool blocks for sound insulation and thermal insulation.
  • Specific information: The building is 68 meters long, 36 meters wide, and has an eaves height of 10.7 meters. It has two stories, each 5.3 meters high, with two spans, each 18 meters wide. It has a parapet wall. The side columns are 400 × 240 mm, the central columns are 450 × 240 mm, the roof edge beams are 350~600 × 180 mm variable cross-section beams, and the roof center beams are 350~650 × 200 mm. It is equipped with two 10-ton single-beam overhead cranes. The upper flange of the crane beam is 320 × 14 mm wide, the lower flange is 220 × 10 mm wide, and the height is 600 mm.

prefabricated steel warehouse

Project Background

Shandong Heze Delong Technology Co., Ltd., located in the Luling Town Industrial Park, High-tech Zone, Heze City, Shandong Province, is committed to the technological research and development of metal materials and molds, as well as the production and sales of metal castings. Due to the company's development needs, it has entered into a second collaboration with Weilan Steel Structure for a steel structure factory building.

prefab steel warehouse pre-engineered steel warehouse

Project delivery

Weilan Steel Structure is committed to providing clients with comprehensive ODM solutions and end-to-end services, integrating design, manufacturing, and installation. We built a unique steel structure factory for Delong Technology, and during construction, the client expressed satisfaction with our results, exceeding expectations. This trust is invaluable to us. We are committed to relentlessly pursuing excellence to ensure successful project delivery.

Related Cases

Previous Previous
Next Next