fude technology steel structure industrial park-0

Precise Requirements, Smart Planning

bg

Fude Technology: Steel structure industrial park

Share: youtube

Key Information Display

  • Area: 10059.87 ㎡
  • Covering panels: The roof panels are made of 0.6mm thick 470 type color steel plate, with stainless steel wire mesh, 50mm thick glass wool, and W38 aluminum foil facing. The wall panels are made of 0.6mm thick 840 type color steel plate.
  • Specific information: The five steel structure workshops are: a spare parts warehouse with a building area of ​​786.24 square meters; an aluminum fluoride finished product warehouse with a building area of ​​1857.32 square meters; a hydrogen fluoride loading room with a building area of ​​278.16 square meters; an aluminum hydroxide and fluorite powder warehouse with a building area of ​​5094.65 square meters; and a slag warehouse with a building area of ​​2043.50 square meters.
steel structure warehouse

Project Background

Henan Fude Technology Co., Ltd., located in the Advanced Manufacturing Cluster Development Zone of Guanyintang Town, Shanzhou District, Sanmenxia City, Henan Province, is a company engaged in the production of specific organic chemicals containing phosphorus, sulfur, and fluorine. Due to the company's development needs, they are collaborating with Weilan Steel Structure on steel structure pipe corridors and 5 steel structure factory buildings, with a total construction area of ​​10,059.87 square meters


steel structure warehouse  prefab Steel Structure

steel structures factory steel factory building

Project delivery
Weilan Steel Structure is committed to providing clients with integrated ODM solutions and full-process services encompassing design, manufacturing, and installation. During the construction of the unique steel structure plant for Fude Chemical, the client clearly stated that the results far exceeded their expectations, and they were very satisfied with the outcome of the collaboration. This deep trust is invaluable to us. We firmly promise to dedicate our full efforts, meticulously adhere to specifications in every aspect of the work, continuously strive to exceed client expectations, and ensure the smooth progress and successful delivery of the project.

Related Cases

Previous Previous
Next Next